Code Enforcement

The Code Enforcement Officer is available at the Stetson Town Office every Thursday
from 5:00pm to 7:00pm. He issues Building Permits and Septic Permits, and makes
sure all construction is up to Town and State Code.

Adam Caldwell

stetson.ceo@gmail.com

Click Below to see the Stetson Building Code.

Stetson Building Code

Stetson Building Permit Application

STEPS TO OBTAIN A BUILDING PERMIT

  1. Prove ownership or have a vested interest in property
  2. Submit Sub-surface waste disposal design if used for living space (excludes garages and out-buildings)
  3. Complete building permit application with plat plan of structure placement on property to show setbacks from lines and highway.
  4. Complete entrance permit from State (if on State # Route)
  5. Property tax form must be obtained for Mobile Home Permits.

SETBACKS ARE 10’ FROM PROPERTY LINES (SIDES & REAR)

Town of Stetson
Fee Schedule

100 sq’ to 300 sq’                   flat $10.00 fee

Over 300 square feet to be $20.00 plus $.05 per square foot

Example

20X20          400 sq’  X  .05  =  $  20.00 + $20.00  =  $40.00 fee
24X24          576 sq’  X  .05  =  $  28.80 + $20.00 =  $48.80 fee
24X28          672 sq’  X  .05  =  $  33.60 + $20.00 =  $53.60 fee
28X40        1120 sq’  X  .05  =  $  56.00 + $20.00 = $76.00 fee
32X40        1280 sq’  X  .05  =  $  64.00 + $20.00 = $84.00 fee
34X50        1700 sq’  X  .05 =   $  85.00 + $20.00 = $105.00 fee
40X60        2400 sq’  X  .05 =  $  120.00 + $20.00 = $145.00 fee
50X70        3500 sq’  X  .05 =  $  175.00 + $20.00 = $195.00 fee

This fee schedule assumes a new construction cost @ 65.00 per square foot and comes very close to the current fee schedule. Changing the formula in other ways was resulting  in a substantial increase or decrease in the current schedule. The upper end of this schedule will be a slightly lower fee, however it will likely provide for additional revenue do to being more consistent. The primary goal was to maintain the same